Your search returned 2 results.

Sort
Results
1.
Bulk power transmission in India-Technology options,issues and challenges held between 10-11 July 2003 at Mumtaz Mahal,Hotel Taj Palace,New Delhi by
Material type: Text Text
Publication details: New Delhi Powergrid 2003
Availability: Items available for loan: Central Power Research Institute (1)Call number: 621.315 (54) POW.03.

2.
Brain storming session held between 10-11th July 2003 by
Material type: Text Text
Publication details: New Delhi Powergrid 2003
Availability: Items available for loan: Central Power Research Institute (1).

Pages
Copyright © 2024 Central Power Research Institute, Ministry of Power, Govt. of India, Bangalore. All Rights Reserved.