500 MW Fossil Fuel Power Plants Simulator Operating Proceedures

By: Material type: TextTextPublication details: Faridabad NPTI 2010Description: 217p
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Status Date due Barcode
Text Text Central Power Research Institute Central Power Research Institute 621.31:662.7 NAT.10 (Browse shelf(Opens below)) Available 26923

There are no comments on this title.

to post a comment.
Copyright © 2024 Central Power Research Institute, Ministry of Power, Govt. of India, Bangalore. All Rights Reserved.