Project report on standardisation of auxiliary power consumption in 210 MW coal fired thermal power stations work carried out at CPRI.,Thiruvanthapuram

By: Material type: TextTextPublication details: Hubli B.V.Bhoomaraddi College of Engineering & Technology 1997Description: 80
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Copyright © 2024 Central Power Research Institute, Ministry of Power, Govt. of India, Bangalore. All Rights Reserved.