Project report on the sensitivity parameter approach to compute the efficiency of a 210 MW coal fired thermal power plant

By: Material type: TextTextPublication details: Hubli B.V.Bhoomaraddi college of engineering and technology 1997Description: 47
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Status Date due Barcode
Text Text Central Power Research Institute Central Power Research Institute 621.311.23 BHU.97 (Browse shelf(Opens below)) Available 20975

There are no comments on this title.

to post a comment.
Copyright © 2024 Central Power Research Institute, Ministry of Power, Govt. of India, Bangalore. All Rights Reserved.