Workshop on transmission line tower design - manufacture - erection - maintenance and testing held at Vadodara from 29 November to 2 December 1994

By: Contributor(s): Material type: TextTextPublication details: Vadodara GEB 1994
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Home library Call number Status Date due Barcode
Text Text Central Power Research Institute Central Power Research Institute 621.315.17 CEN.94 (Browse shelf(Opens below)) Available 18303

There are no comments on this title.

to post a comment.
Copyright © 2024 Central Power Research Institute, Ministry of Power, Govt. of India, Bangalore. All Rights Reserved.